Architectural BIM Modeling

Detailed Architectural BIM (LOD 300)

Coordinated Geometry for Permit Documentation

At LOD 300, every wall, opening, and assembly in the model carries accurate geometry, dimensions, and material data suitable for permit submission and multi-discipline coordination. This is the level where architectural, structural, and MEP models are first federated together to catch conflicts before they reach site.

25+ BIM Projects Delivered
LOD 100–500 Full LOD Range
24hr Response Guarantee
ISO 9001 Certified Quality

Why Suncon BIM

Your Trusted BIM Partner

Permit-Ready Accuracy

Geometry precise enough for authority submission

Coordination-Ready

Federated with structural and MEP for clash checking

Assembly Data

Wall types, floor builds, and finishes embedded in the model

FAQ

Frequently Asked Questions

What can I do with an LOD 300 model?

+

Submit for permit approval, run clash detection against structural and MEP models, and extract preliminary quantities. It is not yet fabrication-ready — that comes at LOD 400.

How long does LOD 300 modeling take?

+

For a mid-size building this typically takes 2–4 weeks depending on complexity and how many disciplines are being coordinated simultaneously.

Free Consultation

Got a project?
Let's talk BIM.

Share your project details and we'll get back within 24 hours with a tailored BIM solution and quote.

  • LOD 100–500 Deliverables
  • Revit / IFC / DWG Outputs
  • Clash Detection & Coordination
  • Scan to BIM from Point Cloud
  • 24-hr Response Guarantee