Construction Documentation
As-Built Documentation
Final Verified Packages for FM Handover
We produce final as-built drawing packages reflecting actual construction — incorporating all approved site variations — suitable for facility management handover and long-term record purposes.
Why Suncon BIM
Your Trusted BIM Partner
Site-Verified
Reflects actual constructed conditions, not design intent
Handover-Ready
Formatted for facility management record-keeping
Long-Term Reference
Reliable base for the building's operational life
FAQ
Frequently Asked Questions
What triggers an as-built update?
+−
Any approved site variation, RFI resolution, or change order that alters the constructed condition from the issued-for-construction drawings.
Do as-builts include all disciplines?
+−
Yes, as-built documentation covers architectural, structural, and MEP scope as coordinated in the final model.