MEP BIM Coordination
Mechanical BIM Modeling (HVAC)
Ductwork, Piping, and Plant Room Layouts to LOD 300–400
We model the full HVAC system — ductwork, chilled water piping, air handling units, fan coil units, and plant room layouts — to LOD 300–400, sized and routed to match the mechanical engineer's design and coordinated with structure and ceilings from the start.
Why Suncon BIM
Your Trusted BIM Partner
Full HVAC Scope
Ductwork, piping, AHUs, FCUs, and plant rooms
Ceiling-Coordinated
Routed to avoid clashes with structure and services
Sized to Engineering
Matches mechanical engineer's calculations exactly
FAQ
Frequently Asked Questions
Do you model plant room layouts?
+−
Yes, including AHU placement, pipework connections, and maintenance access clearances within the plant room model.
Can you route ductwork around structural constraints?
+−
Yes, ductwork and piping are routed with structural and ceiling coordination built in from the first pass, not resolved after the fact.